At home in the Borken district
Our office is in the Denkfabrik im Grünen in Borken. From here, we design projects across West Münsterland and beyond, as far as Duisburg, Düsseldorf and Jülich.
Where we have designed and built
-
Borken14 projects
This is where our office is. From House K and a detached house in Haspelkamp to the listed Villa Grüter and the NETGO Basecamp at the western entrance to the town. In the town centre, we are designing the Brinkquartier.
House K, NETGO Basecamp, Brinkquartier, Denkfabrik im Grünen, Sparkasse Westmünsterland, Villa Grüter, Apartment building in Borken, Eiting House, Montessori day-care centre in Borken, Aehling Farmstead, Old Post Office in Borken, Hotel Lindenhof, Mixed-use building in Borken, Butenstadt competition
-
Velen3 projects, 8 km
Two detached houses in the Häämkes Diik development and the new Arpadis headquarters in the Jägersdyk business park.
-
Heiden2 projects, 4 km
Barrier-free housing built as an Efficiency House (Effizienzhaus) Plus, and an office campus designed to generate its own energy.
-
Reken1 project, 10 km
A campus for services and technology covering more than 14,000 square metres.
-
Gescher1 project, 14 km
Medical practice, physiotherapy, pharmacy and fitness training under one roof.
-
Vreden1 project, 21 km
Two shops and seven apartments on an awkwardly shaped corner plot at the entrance to the town centre.
-
Coesfeld1 project, 22 km
The Lindencarrée, with 40 apartments and four shop units, in place of the ‘Weißer Riese’ (‘White Giant’).
-
Raesfeld1 project, 10 km
A feasibility study for a conference hotel at the castle complex.
-
Isselburg1 project, 30 km
A small-animal veterinary practice in brick and timber in the village of Werth.
-
Further afield
Church in Duisburg-Laar (Duisburg-Laar, about 45 km); Wohnen am Turm (Düsseldorf, about 70 km); Day-care centre at Forschungszentrum Jülich (Jülich, about 110 km)
Building permit applications in the Borken district: who is responsible?
In the Borken district, four towns have their own building authority. For all other towns and municipalities, the district’s building authority is responsible. Since 1 September 2026, building permit applications have been submitted electronically, usually via the Bauportal.NRW.
Building authorityKreis Borken
- Own building authority
- Ahaus, Bocholt, Borken, Gronau
- Kreis Borken
- Gescher, Heek, Heiden, Isselburg, Legden, Raesfeld, Reken, Rhede, Schöppingen, Stadtlohn, Südlohn, Velen, Vreden
- District address
- Kreis Borken, Fachbereich Bauen, Wohnen und Immissionsschutz, Burloer Straße 93, 46325 Borken
Sources: Bauportal.NRW: Kontaktdaten der Bauaufsichtsbehörden, Stand April 2024 (PDF); Bauportal.NRW: Vereinfachtes Baugenehmigungsverfahren
Why a practice from the region
We know the municipalities, authorities and trade firms in the Münsterland. That makes approvals and construction processes more predictable. For the Montessori day-care centre in Borken, for example, the work went mainly to trade firms from the region. And because design, detailed design and site supervision are all under one roof, we can be on site quickly when it counts.
Frequently asked questions
Do you also work outside the Borken district?
Yes. Besides the Borken district and the Münsterland, we have designed projects in Coesfeld, Duisburg, Düsseldorf and Jülich, and we work throughout North Rhine-Westphalia.
Where is your office?
In the Denkfabrik im Grünen at Dülmener Weg 219 in Borken, on the site of the former Hendrik-de-Wynen barracks. You will find directions on our contact page.